  Agenda Item   22.    
City Council Meeting
Meeting Date: 12/01/2020  
FROM: Bill Gallardo

Subject:
Improvements for Final Parcel Map 2015-164 located at 500 S. Kraemer Boulevard
RECOMMENDATION
Accept Improvements and Release Improvement Bonds
BACKGROUND/DISCUSSION
The property located on the south east corner of Imperial Highway and Kraemer Boulevard is about 7.02 acres with a General Plan Designation of Commercial Industrial (C-M) Zone. Currently, the property is fully developed with two (2) existing buildings. The addresses for these buildings are 500 S. Kraemer Boulevard and 2601 E. Saturn Street. See attached Exhibit 'A'  for the property location.

On September 27, 2016, the Tentative Parcel Map 2015-164 (TPM 2015-164) was conditionally approved by Planning Commission per Resolution PC 2016-14 to subdivide the property into two (2) parcels.  Parcel 1 is 2.9 acres and includes the building currently addressed as 500 S. Kraemer Boulevard. Parcel 2 is 4.12 acres and includes the building currently addressed as 2601 E. Saturn Street. Pursuant to the Conditions of Approval, the applicant, PERS JCR Kraemer Office Investors, LLC, is required to reconstruct the existing handicap ramps of the driveway on Kraemer Boulevard in accordance with the latest Americans with Disabilities Act (ADA) and to remove an on-site trash enclosure currently located within a public water easement over the City owned water lines.

On December 19, 2017, the City Council accepted the Final Parcel Map 2015-164 ("Map") and approved the Subdivision Improvement Agreement and $72,400 Improvement Bonds. The agreement and the bonds are to guarantee the construction of the required improvements mentioned above.  
 
Since the acceptance of the Map, the applicant has completed the required improvements and all Conditions of Approval have been satisfied.
FISCAL IMPACT/SUMMARY
The applicant has paid all required fees. There will be no General Fund impact from approval of this action.

Since the acceptance of the Map, the applicant has completed required improvements and satisfied all the Conditions of Approval set forth in Resolution PC 2016-14. Therefore, staff is recommending the acceptance of the ADA ramp improvement in public right-of-way and release of the improvement bonds in the amount of $72,400.
RESPECTFULLY SUBMITTED:
William Gallardo, City Manager
Prepared by:   Hsing Chao, Associate Engineer
Concurrence:  Michael Ho, P.E. Deputy Public Works Director / City  Engineer
                       Tony Olmos, P.E., Public Works Director
Attachments
Exhibit 'A'